type DateTimeRangeTargetingError (v202402)
Lists all date time range errors caused by associating a line item with a targeting
expression.
- Namespace
-
https://www.google.com/apis/ads/publisher/v202402
Field
|
ApiError (inherited)
|
fieldPath
|
xsd:string
The OGNL field path to identify cause of error.
|
fieldPathElements
|
FieldPathElement[]
A parsed copy of the field path. For example, the field path "operations[1].operand"
corresponds to this list: {FieldPathElement(field = "operations", index = 1),
FieldPathElement(field = "operand", index = null)}.
|
trigger
|
xsd:string
The data that caused the error.
|
errorString
|
xsd:string
A simple string representation of the error and reason.
|
DateTimeRangeTargetingError
|
reason
|
DateTimeRangeTargetingError...
The error reason represented by an enum.
Enumerations
-
EMPTY_RANGES
- No targeted ranges exists.
-
NOT_SPONSORSHIP_LINEITEM
- Type of lineitem is not sponsorship.
-
NOT_SPONSORSHIP_OR_STANDARD_LINEITEM
- Type of lineitem is not sponsorship or standard.
-
UNSUPPORTED_LINEITEM_RESERVATION_TYPE
- Line item must have a reservation type of sponsorship, standard or preferred deal to use date
time range targeting.
-
PAST_RANGES_CHANGED
- Past ranges are changed.
-
RANGES_OVERLAP
- Targeted date time ranges overlap.
-
FIRST_DATE_TIME_DOES_NOT_MATCH_START_TIME
- First date time does not match line item's start time.
-
LAST_DATE_TIME_DOES_NOT_MATCH_END_TIME
- Last date time does not match line item's end time.
-
RANGES_OUT_OF_LINEITEM_ACTIVE_PERIOD
- Targeted date time ranges fall out the active period of lineitem.
-
START_TIME_IS_NOT_START_OF_DAY
- Start time of range (except the earliest range) is not at start of day.
Start of day is 00:00:00.
-
END_TIME_IS_NOT_END_OF_DAY
- End time of range (except the latest range) is not at end of day.
End of day is 23:59:59.
-
START_DATE_TIME_IS_IN_PAST
- Start date time of earliest targeted ranges is in past.
-
MODIFY_START_DATE_TIME_TO_PAST
- Cannot modify the start date time for date time targeting to the past.
-
RANGE_END_TIME_BEFORE_START_TIME
- The end time of range is before the start time.
Could happen when start type is IMMEDIATE or ONE_HOUR_LATER.
-
END_DATE_TIME_IS_TOO_LATE
- End date time of latest targeted ranges is too late.
-
LIMITED_RANGES_IN_UNLIMITED_LINEITEM
-
UNKNOWN
- The value returned if the actual value is not exposed by the requested API version.
|
Except as otherwise noted, the content of this page is licensed under the Creative Commons Attribution 4.0 License, and code samples are licensed under the Apache 2.0 License. For details, see the Google Developers Site Policies. Java is a registered trademark of Oracle and/or its affiliates.
Last updated 2024-02-13 UTC.
[null,null,["Last updated 2024-02-13 UTC."],[[["DateTimeRangeTargetingError is an error specific to date and time ranges when associating a line item with targeting."],["This error can occur across multiple services, including AdjustmentService, ForecastService, and others listed in the content."],["The error has a variety of reasons, indicated by the `reason` field, such as overlapping ranges, unsupported line item types, or ranges outside the line item's active period."],["DateTimeRangeTargetingError inherits from ApiError, which provides further details about the error, including the field path and a string representation of the error."],["The namespace for this error is `https://www.google.com/apis/ads/publisher/v202402`."]]],["The provided content outlines errors related to date and time range targeting within ad management services. Key actions involve managing targeted date/time ranges for line items across various services like `AdjustmentService`, `ForecastService`, `LineItemService`, `OrderService`, `ProposalLineItemService`, `TargetingPresetService`, and `YieldGroupService`. The core information details `DateTimeRangeTargetingError` reasons, such as overlapping ranges, ranges outside the line item's active period, and incorrect start/end times, all designed to ensure valid date/time targeting.\n"]]