The duration of a planned campaign.
Fields | |
---|---|
|
Date range of the campaign. Dates are in the yyyy-mm-dd format and inclusive. The end date must be < 1 year in the future and the date range must be <= 92 days long. This field cannot be combined with the duration_in_days field. |
|
The duration value in days. This field cannot be combined with the date_range field. |